
Add to Cart
PCB Equipment SMT Belt Conveyor 1M Manual Inspection Double and single guide
Quick Detail
Type: Belt Conveyor Brand: Xinwei Model: KXW-JB1000L Conveying capacity: 1(t/h) Power: 1(KW) Conveying distance: 2(m) Dimensions: 1000X700X900(m) Weight: 50(kg) Applicable areas: SMT surrounding brand new Wei Pin name inspection feeder model KXW-JB1000L Product Features 1 Double screw widening mechanism to ensure that the transport rails are parallel to each other. 2 It adopts professional anti-static anti-static flat belts and special aluminum profile guide rails to ensure smooth connection and smooth transportation. 3 standard equipped with signal communication interface, can be connected with other devices online. 4 There are two automatic and manual work modes, standard anti-static work table board. 5 Optional standard stand and process board. 6 It adopts electronic governor speed control, and the transportation speed is 0-2M/Min steplessly adjustable. Technical parameters PCB board maximum width 350mm Transport height 910 ± 30 mm Transport speed 0-2M/Min Control mode relay sequence control work mode Manual and automatic two working modes, can communicate power with the front or rear machine 220V, single phase, 50/60Hz Power Consumption 40W Weight Approx.50kg Dimensions (L×W×H) 910×660×1000mm
Feature
Product Name: | SMT CONVEYOR |
Used for: | smt assembly full line |
Warranty: | 1 Year |
Shipment | by air |
Delivery Time: | 1-2Days |
Our Main Market | Whole of the world |
3, responsibility
3.1 Development Department: Revised by the Development Department based on the validity and suitability of the document.
3.2 Production Department: Responsible for the operation of the equipment.
3.3 Public Works Department: responsible for the maintenance of equipment.
3.4 Non-related personnel shall not adjust the parameters of the machine at will.
4, operation process:
4.1 Check before power on
1, check the supply power cord for damage.
2. Check if the device is well grounded.
3, check the control button is reset.
4, check the width of the guide rail is appropriate.
5, check the belt is loose.
6, above no abnormal bootable operation.
4.2 Operation sequence
1, the control panel description
The FINISH button is not self-locking. Each press indicates that the inspection is completed.
PCB board passes and continues to operate.
The PASS/CHECK button is not pressed to indicate
PASS PCB board does not check, automatically pass; press
CHECK indicates that the PCB board needs manual inspection and needs to be used with FINISH.
POWER is the power switch, press power.
LIGHT is a light switch.